The Treadmill Area - Road Runner Project Update
The area between these two walls is going to be home to four computerized treadmills complete with video cameras. Trenches had to be dug in the concrete in order to install the boxes that house both the power and beta wires needed to to operate the treadmills. One of the power boxes installed is visible in this photo...it will be cut off flush with the concrete at a later time.