The Treadmill Area - Road Runner Project Update
The area between these two walls is going to house four treadmills for the Road Runner store. Trenches had to be dug in the concrete in order to install the electrical needed to operate the treadmills. One of the power boxes installed in the concrete floor is visible in the photo.
Road Runner Tenant Finish Project-Update
The drywall is in and we are wrapping up the mechanicals rough-in phase. This photo shows one of the two fitting rooms framed in with drywall. Some of the electrical wiring is visible as well as the spiral ductwork that is being installed right now.